Specifications include, but are not limited to: 1 Mobilization per General Requirements Section 01292 LS 2 Allowance for Differing Site Conditions per General Requirements Section 01212 & 01253 $ 84,000.00 3 Traffic Control and Signs LS 4 Clearing and grubbing, including removal of vegetation LS 5 Removal, haulaway, and disposal of asphalt pavement, including sawcutting and disposal of base material beneath the pavement surface. SF 410 6 Excavation and slough removal for pile, lagging and backdrain installation, including haulaway of excess. CY 103 7 Drill twenty-three (23) holes, 30" diameter, avg 15' deep, for soldier beams per pile schedule - Plan Sheet SB201. Dispose of excess spoils. LF 345 8 Supply and install twenty-three (23) W12x58 steel soldier beams, avg 22' long. Grade 50 per pile schedule - Plan Sheet SB201. Dispose of excess spoils. LF 506 9 Supply, pump, and place concrete for embedded portion of soldier beams. CY 59 10 Supply, pump, and place 100-E-100 slurry backfill for upper portion of soldier beams. CY 4 11 Supply and Install 7'-9" x 1'-6" precast lagging panels, including steel support plates, architectural finish, and stain color. EA 84 12 Supply and Install 7'-9" x 1'-6" precast lagging panels with weep holes, including steel support plates, architectural finish, and stain color. EA 21 13 Supply and install 3/8" diameter pea gravel wrapped in nonwoven fabric behind bulkhead, min. 12" wide. CY 2 14 Place backfill in lifts and compact to 90% min. relative compaction. CY 32 15 Recontruct roadway with asphalt concrete (AC) pavement 6" thick over 6" crushed miscellaneous base (CMB) (including compaction). SF 525 16 Construct new 8" high AC curb, including transition, per City Standard Plan S-412-0. LF 176.