Specifications include, but are not limited to: The Termite Baiting Systems active ingredient must be registered by the Department of Agriculture and Forestry. Tamper resistant bait containers must be used to limit access to authorized personnel only. Bait Station Replacement and Inspection Bait Station placement should be done in accordance with label directions and manufacturer’s recommendations. Spacing should be at industry standard intervals around the entire perimeter of the building. Walkways, driveways, parking areas and other cement or asphalt covering adjacent to the structure will be cored or capped with tamper resistant covers. All stations must be inspected according to label directions and manufacturer recommendations or state law, whichever is more stringent. When termites are detected in a monitoring device, one or more additional stations will be installed within 6 to 12 inches of the infested device if feasible.