Specifications include, but are not limited to: The project includes, but is not limited to, removal of existing storm drain inlet, removal of existing storm drain piping and outlet structure, furnishing and installation of new storm drain inlet, furnishing installation of new storm drain piping, connection of storm drain piping to existing County of Los Angeles storm drain line, reconstruction of P.C.C. curb and gutter and adjacent Asphaltic Concrete (AC) pavement, installation and removal of temporary construction fencing around the work area, vehicular and pedestrian traffic control, necessary demolition, excavation, and restoration and other related work to complete the work per project’s plans and specifications. The engineer’s cost estimate for the project is $102,000.