Specifications include, but are not limited to: Complete an initial site visit to obtain measurements, confirm the number of floor outlets needing removal, and locate the new drop-down poles for power and data based on the site floor plan. Specifically, In room 105/106 before the new furniture date of installation, remove all existing outlets above the floor level and replace them with suitable solid covers to level the floor and, if possible, de-energize the now abandoned lines. No cutting or drilling of the floor tile is permitted before or immediately after the new furniture date of installation run an electrical line sufficient for the anticipated load to three drop-down poles located on the site plan, new lines from the panel may be needed. the contractor may choose to use existing poles or provide new poles sufficient for the electrical needs and data immediately after the new furniture date of installation connect the office cubes data and electrical to the new drop-down poles. In room 201 before or immediately after the new furniture's date of installation, combine the date and electrical lines from two poles into one pole located on the site plan. the contractor may choose to use existing poles or provide new poles sufficient for the electrical needs and data immediately after the new furniture date of installation connect the office cubes data and electrical to the new drop-down pole. The Contractor shall follow best practices for running new lines The Contractor shall minimize impacts to other building occupants The CONTRACTOR shall perform work during normal State office hours between 7:45 am and 4:30 pm. unless alternative arrangements are made. SITE INSPECTION: CONTRACTORS may contact the District Health Office to schedule a site visit to prepare a quote and receive site plan