Specifications include, but are not limited to: • BASE BID work includes installing 8” diameter force main pipeline from the Town of Brunson to the Town of Hampton. Pipeline includes 24,245 lf 8” PVC, 6,415 lf 8” HDPE or 8” FPVC, 120 lf 8” DIP, 60 lf 8” DIP in 20” steel encasement bore-andjack, 14 air release and vacuum valves, 60 lf 12” DIP gravity sewer, 2 sewer manholes with interior epoxy coating, and addition of a 6” flow meter, vault, etc. at the influent pump station. • ALTERNATE BID includes the downsizing of 5,480 lf 8” PVC & DIP to 6” PVC & DIP • ALTERNATE BID includes removal of 960 lf of 8” PVC force main, one coating of manhole and one air release valve with the addition of 960 lf of 12” PVC gravity sewer, 2 additional manholes. • ALTERNATE BID includes the rehabilitation of 11 MHs