Specifications include, but are not limited to: The structures carry Interstate 79 (I-79) over Browns Creek, County Route (CR) 25, and a rail trail. The BARS Numbers are 17A246 (NB) and 17A247 (SB). This rehabilitation project shall consist of reviewing current Inspection Reports and performing adequate fieldwork to permit all recommended and approved repair items to be quantified and addressed in the contract plans and related documents. The existing bridge roadway width is 33 feet-1 inch, and the bridge overall length is 262 feet-3 inches and is located 2.17 miles north of West Virginia Route (WV) 270. The professional services for the bridge rehabilitation shall include the preparation of construction plans, surveying, and traffic engineering services with special consideration given to Design Directive 681 – Work Zone Safety and Mobility. NEPA Documentation will be handled in-house by the Technical Support Division. Post Design Services, if required, shall be by separate Agreement. Please be advised that this project is on an accelerated schedule.