Specifications include, but are not limited to: The Project includes improvements to support the expansion of the existing concrete pedestrian plaza at the ferry dock, located near the intersection of Tracy Way and El Portal, and associated pedestrian circulation improvements.The work consists of, but is not limited to: new concrete flatwork at the pedestrian plaza; new curb, gutter, and sidewalk; new concrete ADA parking stalls; utility trenching and installation for domestic water, storm drainage improvements, and electrical conduit; relocation of solar-powered parking ticket machines; relocation of Sally Sanford water foundation; tree removal and tree planting; landscaping and irrigation; pavement grinding and use of GravelPave surfacing; minor striping, marking, and signage improvements; traffic control; water pollution control; demolition of existing hardscape and softscape surfaces to facilitate construction; and ancillary work as shown on the project plans. Construction will need to be staged to allow for continual vehicle access to and around the adjacent parking lot and to the Sausalito Yacht Club, and continual pedestrian access to and from the ferry dock.