Specifications include, but are not limited to: A. Make arrangements with Utility Company to obtain permanent electric service to the Project. B. Overhead: Install service rack and weatherhead at height as required by Utility Company. Utility Company will connect service drop to service entrance conductors. C. Spray all exposed conductor sections and termination lugs with Scotch #1602 IviSpray or approved equal red electrical sealer. D. Meter sockets shall be installed with the centerline of the socket opening no more than 72 inches and no less than 60 inches above finished grade. The meter socket shall be installed with a minimum 10 inches of side clearance to each side of the socket. E. Self-contained meter sockets equipped with a 5th jaw for network service but served from a single phase, 3-wire 120/240 Volt source shall have the 5th jaw and its associated wiring removed from the socket.