Specifications include, but are not limited to: Paper Stock • Production costs and conditions must be based on the paper stock(s) stated in specifications or functional equivalent regarding quality, recycled content, and performance. Quality Control • All work shall be performed by the contractor in accordance with the specifications in a thoroughly firstclass manner and must be satisfactory to the agency. Presswork shall be first grade, producing a clear, sharp impression. • In order to avoid unnecessary changes in composition and presswork, the agency’s representative shall provide the contractor with directions. • All cost for the movement of proofs and/or copy shall be the responsibility of the contractor. • If the agency’s complete copy, artwork, etc. are not ready for the contractor on the date listed in the specifications, the delivery date may have to be extended.