The objective of this work is to re-build the arena wall at the Morrow County fair OTPR arena. This will include replacing the current plywood with marine grade plywood and adding structural support (9’ from the ground) for the wall . It also entails finishing a continuous fence (5 rail) at the catch pen side of the arena. Projects may include, but are not limited to, the following: 1. A pre-design meeting is required – with Tony Clements 2. Priming and painting plywood (sprayer needed) and panels that are attached 3. Welding fences and archway 4. Concrete work 5. Strapping and securing plywood 6. Painting all arena panels (itemize separate for materials and labor) 7. If panels are damaged beyond repair contact MCF