Specifications include, but are not limited to: Sealed Bids for a Dam Breach Analysis (Perryville Dam #223) will be received by the Town of Perryville, at the office of the Perryville Town Hall, 515 Broad Street, Perryville MD 21903, until July 8, 2024 local time on 2:30 pm, at which time the Bids received will be publicly opened and read. The study shall conduct a 100 year storm Dam Breach Analysis using all the current data, methods and software. MDE Dam Safety and the Town of Perryville want to mitigate any dangers of downstream flooding if and when the Perryville Dam 223 is breached. The Dam Breach Analysis must evaluate the structure during a 100 yr storm event. During this 100 yr storm event, the dam’s reservoir must be no deeper than 3 feet. In addition, there must be no downstream flooding during the 100 yr storm due to either Dam 223 being breached or during the dam breaching process itself. The study must determine the size and extent of the dam breach to mitigate any potential to flood neighboring properties downstream.