Specifications include, but are not limited to: 1. Coordination with Worcester County for access into the Central Landfill Facility to perform the work outline in the Contract documents and to maintain access to and active pumping operations within the pump building for the filling of leachate tanker trucks. 2. Connection to existing 4” DI pipe, furnish and install pipeworks, valves, fittings, pump, pump motor, and connection of new electrical components to the existing electrical system within the pump building. 3. Perform a private utility locate and perform test pitting. Perform restoration of excavations. 4. Installation of approximately 50 linear feet of 2-inch PVC Schedule 80 pipe through the pump building wall above grade, transitioning below grade outside of pump building to the meter vault. 5. Furnish and install magnetic meter, meter vault, and associated isolation valving. 6. Furnish and install 2-inch HDPE SDR-11 forcemain pipe, inline flushing valves, and terminal flushing vales via open cut from meter to the connection point along the railroad tracks per the Contract Drawings. 7. Performing hydrostatic testing of the installed forcemain pipe...