Specifications include, but are not limited to: Main Level: 1. Final cleaning - construction - Commercial 1,409.42 SF. Entry/Foyer: 2. Detach & Reset Fluorescent light fixture 12.00 EA 3. 5/8" drywall - hung, taped, floated, ready for paint 998.74 SF 4. Batt insulation - 6" - R19 - paper / foil faced 244.00 SF 5. Batt insulation - 10" - R30 - paper / foil faced 313.41 SF 6. Vapor barrier - visqueen - 6mil 313.41 SF 7. Paint ceiling lath - two coats 313.41 SF 8. Seal the walls and ceiling w/PVA primer - one coat 998.74 SF 9. Paint the walls and ceiling - one coat 998.74 SF 10. Mask and prep for paint - plastic, paper, tape (per LF) 85.67 LF 11. Cove base molding - rubber or vinyl, 4" high 85.67 LF 12. Floor preparation for resilient flooring 313.41 SF 13. Vinyl tile 313.41 SF 14. Heat/AC register - Mechanically attached - Detach & reset 3.00 EA 15. Wall heater - Detach & reset 1.00 EA 16. R&R Smoke detector 1.00 EA 17. R&R Fire alarm - Horn/Bell 1.00 EA. Storage Closet: 18. Detach & Reset Fluorescent light fixture 1.00 EA 19. 5/8" drywall - hung, taped, floated, ready for paint 247.96 SF 20. Batt insulation - 6" - R19 - paper / foil faced 244.00 SF 21. Batt insulation - 10" - R30 - paper / foil faced 38.63 SF 22. Vapor barrier - visqueen - 6mil 38.63 SF 23. Paint ceiling lath - two coats 38.63 SF.