Specifications include, but are not limited to: G-1 Mobilization, Bonds, Insurance and Demobilization 1 LS G-2 Erosion Control 1 LS G-3 Traffic Control 1 LS G-4 Hydrostatic Testing of Existing 30-inch Force Main Pipeline Segments a. Segment 'A-B' 1 LS b. Segment 'B-C' 1 LS c. Segment 'C-D' 1 LS d. Segment 'D-E' 1 LS e. Segment 'E-F' 1 LS G-5 Waterline Relocations a. Waterline 'T' Relocation 1 LS b. Waterline 'U' Relocation 1 LS c. Waterline 'V' Relocation 1 LS d. Waterline 'W' Relocation 1 LS G-6 Relocate Existing Sanitary Sewer Laterals 18 EA G-7 Revise Piping, Install Vault, Air Valves and Odor Control Assemblies for OAVA Sites 1 and 1A 1 LS G-8 Complete Interior Piping, Odor Control Assemblies and Install Air Valves inside Existing Vaults at OAVA Sites a. Existing Vault at OAVA Site 2 1 LS b. Existing Vault at OAVA Site 3 1 LS c. Existing Vault at OAVA Site 4 1 LS d. Existing Vault at OAVA Site 5 1 LS e. Existing Vault at OAVA Site 6 1 LS f. Existing Vault at OAVA Site 7 1 LS g. Existing Vault at OAVA Site 8 1 LS h. Existing Vault at OAVA Site 9 1 LS i. Existing Vault at OAVA Site 10 1 LS j. Existing Vault at OAVA Site 12 1 LS