Specifications include, but are not limited to: • Existing water services from box to main to be removed. From box to house will remain in place. • Installation of approximately 350 feet of 6” ductile iron water main from connection with the water main on Bushee Street and terminating at the end of Globe Street past #17 Globe Street. • Connection to Bushee Street water main must include installation of tee and valve. • Cut and cap of existing 1.5” main at Bushee Street. • Pressure test and chlorination of new installations is required. • Installation of new fire hydrant at the termination of the new water main past #17 Globe Street. • Connection of 5 new water services box to main, including replacement of curb stops. • Installation of 1” stub for future service on Atlantic Avenue. Location to be determined in field. • Backfill with suitable materials per included Attleboro Department of Public Works Specifications