Specifications include, but are not limited to: 1. Work Involving Asbestos Containing Material (ACM): 1.1 Testing for asbestos has been conducted at the facility scheduled for renovation, demolition, reconstruction, alteration, remodeling, or repair. Results of the asbestos testing are summarized in Division 50 00 00 Project-Specific Available Information, Section 50 30 00 Hazardous Building Materials Inspection and Inventory at the end of the Technical Specification Sections. 1.2 Under no circumstance shall this information be the sole means used by the Contractor for determining the extent of asbestos. The Contractor shall be responsible for verification of all field conditions affecting performance of the Work. 2. Work Involving Lead-Based Paint (LBP): 2.1 If this facility was constructed prior to 1978 it is likely to have painted surfaces containing lead-based paint (LBP). 2.2 Testing for lead-based paint has been conducted at the facility scheduled for renovation, demolition, reconstruction, alteration, remodeling, or repair. Results of the LBP testing are summarized in Division 50 00 00 Project-Specific Available Information, Section 50 30 00 Hazardous Building Materials Inspection and Inventory at the end of the Technical Specification Sections. Under no circumstance shall this information be the sole means used by the Contractor for determining the extent of LBP. 2.3 The Contractor shall be responsible for verification of all field conditions affecting performance of the Work. 3. Work Involving Polychlorinated Biphenyls (PCBs) in Building Materials: 3.1 If this facility was constructed between 1950 and 1978 it is likely to have caulk and/or glazing containing PCBs. 3.2 Testing for PCBs has been conducted at the facility scheduled for renovation, demolition, reconstruction, alteration, remodeling, or repair. Results of the PCB testing are summarized in Division 50 00 00 Project-Specific Available Information, Section 50 30 00 Hazardous Building Materials Inspection and Inventory at the end of the Technical Specification Sections. 3.3 The Contractor shall be responsible for verification of all field conditions affecting performance of the Work.