Specifications include, but are not limited to: USA Health System – University Hospital presently has two existing generators that are over 50 years of age. This project will provide a new full load generator that will fully support the entire Hospital facility located at 2451 University of South Alabama Medical Center Drive facility. The project will interface with Alabama Power and USA generators so that the hospital will have a minimum loss of power. The electrical standby design could include multiple generators as part of the system. This will provide USA Health – University Hospital support to improve the operating system and reliability. This project will require companies with specialty experience in high and medium voltage main primary power feeds and emergency power generators. Primary power and emergency power is critical to the care of patients in the Hospital. The contractor should have past experience with working on critical power outages and switching to new feeds with limited down time. This will be a turnkey prime contract that includes the total scope of work which includes the following; demo, site work, foundations, equipment, and electrical.