Specifications include, but are not limited to: ○ Roof Shingles to match existing color on buildings. ○ Ice shield and waterproof underlayment to be installed to meet local code requirements and industry standards. ○ Contractor to provide and manage disposal containers throughout the duration of projects. All roofing materials and debris must be picked up and district properties left clean daily, including loose nails to be magnetically picked up. ○ Roofing structures must be left “weather tight” at the end of each day. ○ Any unforeseen damage or rot to existing roofing structure and decking shall be quoted and repaired as an additional work or change order. Written submission and approval are required before any additional work can be done. ○ All flashings and terminations must be resealed or replaced if deemed necessary.