The scope of this infrastructure replacement project will be minimal in terms of reconfiguring existing spaces, and primarily consists of replacement/upgrades to components of existing building systems (Roofing, HVAC and Windows). Space uses and occupant loads are anticipated to remain the same within the building The existing egress routes and travel distances will not be altered under this project. This project will be governed by the codes currently adopted by the State of Colorado agencies with jurisdiction. We will be employing the codes and standards as amended by Office of the State Architect or other adoptive State Agency. In addition, the City of Pueblo Fire Department has jurisdiction over any Fire Sprinkler and Fire Alarm modifications. The work of this Contract, except as otherwise specified, shall include all labor, materials, equipment, and facilities necessary to produce the required result, all transportation and services, and all materials and equipment incorporated and intended to be incorporated in such results. The Work includes all fees, taxes, permit costs, insurance premiums, and costs for overhead, superintendence, temporary facilities, and other direct and indirect costs and expenses incidental to the performance of the Work.