Specifications include, but are not limited to: 1. The person responsible for overseeing the environmental and archaeological assessments shall be proficient in conducting assessments on the Navajo Nation. 2. Project will need to obtain full Environmental Compliances (EA, Biological) 3. Obtain a FONSI from Navajo BIA Region. 4. Navajo Nation Heritage (NNH) and Navajo Nation Historic Preservation Department (NNHPD) Fieldwork, Report Standards and Guidelines will be adhered to. 5. TASK #1: Environmental Assessment for 556’ long x 20’ wide, 306’ long x 50’ wide of land for electrical power line for Continental Divide Electric Coop. Obtain Environmental Compliance. All verbage needs to indicated that it’s for Continental Divide Electric Coop. 6. Task #2: Archaeological Survey for 556’ long x 20’, 306’ long x 50’wide of land for electric power line for Continental Divide Electric Coop. Obtain Archaeological Compliance. All verbiage needs to indicated that it’s for Continental Divide Electric Coop. 7. Task #3: Environmental Assessment and Archaeological Assessment for 1362’ long x 30’ wide and 120’ long x 30’ wide of land for a new NTUA Water Line. All verbiage needs to indicated that it’s for Navajo Tribal Utility Authority (NTUA) Utility Easement. 1362’ of the proposed water line is in the BIA N54 ROW. 8. Task #4: Environmental Assessment and Archaeological Assessment for 6.64-Acres of Land for Legal Land Withdrawal.