Specifications include, but are not limited to: 1. Install temporary erosion and sediment control construction Best Management Practices (BMPs) as designated on the site plan and BMP detail. (Item 2 of Exhibit A’s Bid Schedule of Values). 2. Clear the project area. Work shall be inclusive of removal and disposal of all vegetation, grass, brush, and other objectionable materials within project area. (Item 3 of Exhibit A’s Bid Schedule of Values). 3. Install 6” thick select borrow material (approximately 17 CY) as designated on the site plan (Item 4 of Exhibit A’s Bid Schedule of Values). 4. Install 6" deep polyethylene cellular confinement system (approximately 72 SY) as designated on the site plan (Item 5 of Exhibit A’s Bid Schedule of Values). 5. Install 3B coarse aggregate fill for the polyethylene cellular confinement system and to level-out ground (approximately 14 CY) as designated on the site plan (Item 6 of Exhibit A’s Bid Schedule of Values). 6. Install concrete infill for the polyethylene cellular confinement system (approximately 4 CY) as designated on the site plan (Item 7 of Exhibit A’s Bid Schedule of Values). 7. Miscellaneous restoration work of the project site (Item 8 of Exhibit A’s Bid Schedule of Values). 8. Implement traffic control measures (Item 9 of Exhibit A’s Bid Schedule of Values). 9. Over-excavation and disposal of any unsatisfactory pavement or soil materials and backfilling with select borrow (6 CY, Item 10 of Exhibit A’s Bid Schedule of Values). 10. Install additional slope erosion protection and water pollution, dust, erosion control BMPs as directed and required (Item 11 of Exhibit A’s Bid Schedule of Values).