Specifications include, but are not limited to: The potable water section of the project consists of installation of 11,500 linear feet of 16” diameter ductile iron pipe; 2,840 linear feet of 12” diameter ductile iron pipe; 180 linear feet of 10” diameter ductile iron pipe; 760 linear feet of 8” ductile iron pipe; 290 linear feet of 30” HDPE directionally bored; 980 linear feet of 18” HDPE directionally bored; 540 linear feet of 16” HDPE casing directionally bored; 160 linear feet of 14” HDPE directionally bored; 80 linear feet of 10” HDPE directionally bored; 790 linear feet of 24” steel casing bored; 115 linear feet of 18” steel casing bored; 347 linear feet of 16” ductile iron pipe bored; 20 linear feet of 8” ductile iron pipe bored; 195 linear feet of miscellaneous service bores; 1,295 linear feet of 18” HDPE installed in casing; 600 linear feet of 10” HDPE installed in casing; and associated valves, fire hydrants, fittings, and appurtenances. The sanitary sewer section of the project consists of installation of 2,669 linear feet of 12” through 4” diameter PVC gravity sewer main; 168 linear feet of 18” steel casing bored and jacked; 320 linear feet of 14” steel casing bored and jacked; 112 linear feet of 18” steel casing open-cut; 355 linear feet of 14” steel casing open-cut; 7 sanitary sewer manholes; and associated appurtenances.