Specifications include, but are not limited to: • Rehabilitation of approximately 9,300 linear feet of 8” – 15” sanitary sewer through cured in place pipe (CIPP) lining. • Perform gravity sewer pipe spot repairs prior to CIPP lining. • Installation of approximately 580 linear feet of 8” sanitary sewer main. • Installation of approximately six (6) new concrete sewer manholes. • Inspection and rehabilitation of approximately 102 sanitary sewer laterals from the mainline to within 5’ of the building. • Restoration of all disturbed surfaces to pre-construction conditions, or better, as called for in the Plans. • Preparing and executing traffic control plans for all work in roadways. • Perform additional and incidental Work, as called for by the Specifications and Plans.