The Vendor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittal s, testing, and other items necessary for the proper execution and functioning and shall make all installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive): Maintenance needed: 1. The pool surface is separating from the foundation. The existing surface is to be removed and replaced. 2. Scope of Work is below. a. Remove existing plaster surface. i. Clean to base. b. Re-plaster pool with base white color. Exclude splashpad. i. Resurface as is existing. ii. Pool walls to be included. iii. Measure pool area for accuracy. Page 3 of 4 Sourcing Event – ITQ Form February 2020 c. Remove and reinstall existing railings. 3. Perform a site visit for accurate measurements and review. a. Site visit to be scheduled through Purchasing Department. 4. Repair any damage caused to site during work performed. 5. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by vendor. 6. All trash and debris to be removed by Vendor and hauled off. a. Do not use City dumpster. 7. Clean-up a. Clean area when work is complete. Area to be ready for business use when finished.