Supply, deliver, and install a new load center at the intersection of Stanley Road and Parks Hwy in Wasilla. This work is to replace a damaged meter base/panel. The new load center should be comparable to the damaged 122-40 LC-F load center, and able to power four street pole lights. Exact specifications for the damaged load center can be found in Attachment 1. If necessary, the damaged unit may be inspected at 1420 S. Industrial Way, Palmer, AK 99645 during normal business hours, Monday – Friday 8 AM – 5 PM. The existing concrete pedestal – which does not need repair – is located at the intersection of Stanley Road and Parks Hwy in Wasilla. Quote should include any applicable locates, materials, equipment, labor, and traffic control.