Generally, the scope of work consists of demolition of the existing area and construction within the MOB Radiation Oncology Imaging Department area. This is a phased project consisting of two (2) phases, with each phase receiving new equipment, including new finishes within the spaces. All work is complete with all materials, labor, structural, plumbing, fire protection, mechanical, and electrical work, etc. as indicated in the drawings and as specified. This project includes Owner Purchased, Contractor Installed equipment, pre-ordered to assist with delivery schedule. Coordination with Owner will be necessary for scheduling the delivery and installation of the Owner’s Equipment to ensure that areas are completely ready for Owner’s equipment arrival.