Specifications include, but are not limited to: MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; TRAFFIC CONTROL 1.000 LS; LIMB TRIMMING 1.000 LS; REMOVAL & DISPOSAL OF EXISTING PAVEMENT 300.000 SY; UNCLASSIFIED EXCAVATION 70.000 CY; BORROW EXCAVATION 736.000 CY; EXCAVATION FOR SHOULDER PAVING 194.000 STA; HAULING OF EXCAVATED SHOULDER MATERIAL 194.000 STA; MAINTENANCE STONE 23.750 TON; LIQUID ASPHALT BINDER PG64-22 197.450 TON; FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,375.000 SY; MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 577.000 SY; MILLED-IN RUMBLE STRIP 5.520 MI; HOT MIX ASPHALT SURFACE COURSE TYPE C 2,125.000 TON; DRIVEWAY PAVING-SURFACE TYPE D 86.250 TON; ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 28,066.000 SY; WARM MIX ASPHALT INTERMEDIATE COURSE TYPE B - SPECIAL 1,295.360 TON; PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 280.000 SF; 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 750.000 LF; 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 60,000.000 LF; 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 300.000 LF; 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,951.000 LF; 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 37,101.000 LF; 6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 250.000 LF...