Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS CONSTRUCTION STAKES, LINES & GRADES 1.000 EA TRAFFIC CONTROL 1.000 LS RAILROAD INSURANCE AND FLAGGING CSX 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,526.000 SY REMOVAL & DISPOSAL OF EXISTING CURB 44.000 LF BORROW EXCAVATION 220.000 CY MAINTENANCE STONE 9.990 TON LIQUID ASPHALT BINDER PG64-22 1,303.716 TON FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 100.000 SY FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 899.000 SY MILLING EXISTING ASPHALT PAVEMENT 4.0" 103,968.789 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,050.000 SY HOT MIX ASPHALT SURFACE COURSE TYPE B 9,403.520 TON DRIVEWAY PAVING-SURFACE TYPE C 231.000 TON WARM MIX ASPHALT INTERMEDIATE COURSE TYPE B - SPECIAL 14,295.709 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,044.000 SF PAVE. MARK.(TEMP-PAINT)12INX18IN WHITE TRIANGLE YIELD BAR 120.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 7,548.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 22,940.000 LF 8" WHITE SOLID LINES PERM.PVMT.MARKINGS 48.000 LF 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 40.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 634.000 LF WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 25.000 EA WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 25.000 EA WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING 3.000 EA WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 5.000 EA RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 12.000 EA 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 1,280.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 36,228.000 LF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 22,644.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 68,820.000 LF