Specifications include, but are not limited to: Respondent will: 1. Analyze the existing reports, plans, and information. 2. Determine the best design and construction approach for the bridge design. 3. Design the bridge replacement in accordance with Federal Highway Administration (FHWA), CTDOT, and Town Standards. 4. Provide updated survey and traffic data. 5. Provide the necessary ROW mapping. 6. Provide and analyze the hydraulic data. Provide the required hydraulic, hydrologic, scour, and drainage reports. 7. Prepare new plans, specifications, and bid package for construction. 8. Prepare and acquire all necessary environmental permits from DEEP (including OLISP), ACOE, CTDOT, Local IWWA, Local P & Z, and any other applicable permits. 9. Provide construction inspection services if requested by the Town prior to the start of construction.