Specifications include, but are not limited to: Remove and dispose of asbestos containing materials in accordance with the Contract Documents. The Work of this Section shall include, but not be limited to the following: 1.1.1.1 Performance of interior demolition to uncover and gain access to asbestos containing building materials. 1.1.1.2 Removal of asbestos-containing building materials listed in the Inventory of Asbestos-Containing Materials. 1.1.1.3 Transportation of asbestos-containing waste materials to an approved disposal site by a licensed asbestos waste hauler. 1.1.1.4 Disposal of asbestos-containing waste materials at an approved asbestos waste disposal site. 1.1.2 Pre-Requisite Work: The Owner will be responsible for vacating the areas where work will take place, and removing all movable objects and furnishings prior to the start of prep work for asbestos abatement. 1.1.3 Special Requirements: The abatement activities will be performed while school is not in session and the building is not occupied with children.