Mobilization, demobilization, and cleanup; traffic control and construction phasing; construction survey and monument preservation; implementing best management practices (BMP); clearing and grubbing; removing concrete and stamped concrete; unclassified excavation; adjusting utility boxes, manholes, and vaults; pavement resurfacing (coldmilling, transition and edge grinding, constructing AC level course, constructing ARHM finish course, and constructing full depth AC base course sections), constructing concrete curb and gutter, sidewalk, driveway, spandrel and curb ramp, furnishing and installing pavement markers, markings, traffic signs and traffic striping, construction of landscaping and irrigation system, removing and constructing catch basin decks, installing traffic signal loops, as-built drawing preparation, and all other work necessary to complete the Contract in accordance with the Contract Documents. Unless otherwise specified, the Contractor shall furnish all materials, equipment, tools, labor, and incidentals necessary to complete the Work.