Specifications include, but are not limited to: Contractor shall provide all equipment, materials and labor to complete the work described or referenced in this rfp and within the provided Environmental Systems design. 1. Install an on-site septic system per the approved septic design provided by Environmental Systems dated 6/9/2023. Contractor shall ensure a complete and functional system. 2. The contractor shall have the existing septic tank pumped and crushed or filled. Contractor shall assume tank holds up to 1,600 gallons. Contractor shall complete tank abandonment form and submit a copy to the Project Coordinator, including pumping slip. 3. Contractor is responsible for cutting vegetation and tree removal as required to install the system in accordance to MN Chapter 7080. Contractor is responsible to cutting trees located within the mound foot print and immediately around the mound, as needed to access the area to construct said mound. Trees shall be cut flush with the ground. Any trees measuring 6” or more in diameter shall be cut into 8’ sections and hauled to the DNR shed located on Ojibwe Rd. Smaller trees or brush cleared can either be chipped or hauled away for offsite disposal. 4. Contractor shall follow proper MN Chapter 7080 mound prep procedure, keeping traffic off the designated mound area. Contractor shall be responsible for the cost of any: compaction testing; re-design fees; or additional costs associated with system redesign or relocation; if these expenses are incurred due to contractor or subcontractor damaging the mound location.