The work shall consist of, but not be limited to, the following: 1.2.1.1 Provide all scope of work shown on the plans and specifications, including all earth & site works - cutting/saw-cutting & demolition required for finish site work, concrete paving, trenching & backfill for new utilities or re-routing of existing utilities, demolition of existing site items. Once the portable buildings are installed and anchored to the foundation system there is work to be installed to the interior of the modular, i.e., data/communication/fire alarm wiring and devices as shown on the drawings. All work shown on the electrical, plumbing, and civil drawings and all work as shown on all documents, addenda, and as described in all specification sections. 1.2.1.2 Review all as-builts, and site survey plot plans, and contact all agencies and the Project Manager before excavation to ensure that all utility services will not be disrupted. 1.2.1.3 Provide all necessary shoring, barricades, caution tape, and trench plates for open excavations to maintain safety requirements and as necessary to meet building and safety codes that are required in the General Conditions. 1.2.1.4 Continuous housekeeping and daily clean-up are mandatory. The Contractor shall provide a separate debris box onsite and shall put all debris in the debris box and/or remove debris from the site at the Contractorís own expense before the end of the work day or as directed by the Districtís Project Manager. All debris boxes and containers shall be kept free of graffiti at all times. If the Contractor fails to perform daily clean-up, the Districtís Project Manager shall order that clean-up be done at the Contractorís expense. The contractor shall provide daily off-site clean-up of all mud, dirt, dust, and debris from the construction work. 1.2.1.5 Punch list, final clean up, and closeout per contract construction schedule. Parties agree that delays to punch list, final clean up, and closeout would constitute a delay in project completion and, therefore, entitle the District to withhold and retain potential liquidated damages per the Contract Documents from the Contractorís progress payments.