Specifications include, but are not limited to: UPSTAIRS MECHANICAL, CONTROL ROOM, ENTRY HALLWAY, UPPER STAIR LANDING, LAB, AND OFFICE • Remove and save for customer one metal cabinet and one metal control desk. o We will attempt to move these items whole, however due to the sizes of the cabinet and desk vs the opening size of the exterior doors it may be necessary to cut. If this is the case, we will attempt to cut in locations that can be re-welded to allow reassembly later. • Move both metal cabinets to customers storage locations. • Build temporary floating desk for computer station required for plant operation. o Temp desk will be bracketed to the wall to allow access for flooring replacement. • Demo and dispose of all sheet vinyl flooring and cove base. • Repair walls where cove base was removed and texture to match. • Patch sheetrock as needed where electrician opened for data outlet move. • Re-texture to match areas behind doors where handles caused damage to walls that were repaired by others. • Tape and texture to match patches done to cover data outlet moves. • Tape and texture patch done by others under new drinking fountain. • Paint all walls using one color. • Paint interior window trim of thirteen windows, and interior trim for four skylights in lab using one color. • Prep floors for new LVP throughout excluding tiled floor at lab. • Provide and install new customer selected LVP to all areas excluding lab. • Provide and install new customer selected cove base in all areas. • Build and install new Dual level desk under windows in control room area. • Paint a new desk in customer selected color. • Remove temporary floating desk once flooring and base installation are complete. • Repair any damage to sheetrock incurred because of temporary desk. • Tape and texture repair to match walls. • Touch up paint as needed. UPSTAIRS BATHROOM REMODEL • Demo and dispose of vanity cabinet, laminate countertop, one sink, in wallpaper towel dispenser, and sheet vinyl from walls. • Remove and save one toilet and one urinal in the upstairs bathroom. • Remove and save partition and door at toilet stall at upstairs bathroom. o The partition and door must be removed to allow room for new flooring installation. • Demo and dispose of all sheet vinyl flooring and cove base. • Repair walls where cove base was removed and texture to match. • Open wall below removed paper towel dispenser. • Re-frame wall below removed paper towel dispenser to allow space for new garbage can. • Repair sheetrock where sheet vinyl was removed from walls. • Add new sheetrock to new framed area for new garbage can and to hole where paper towel dispenser was removed. • Tape and texture new sheetrock to match existing in bathroom. • Paint all walls in bathroom using one color. • Provide and install new 50” vanity cabinet. • Provide and install new quartz countertop with back and side splashes. • Provide and install a new under mount sink. • Provide and install new FRP paneling at toilet and urinal area only. • Provide and install new faucet and basin drain at new sink. • Provide and install new ¼ turn valves at sink and toilet. • Tie in a new faucet and drain to existing plumbing. • Reinstall one toilet and one urinal.