Specifications include, but are not limited to: Supply and install all materials including ARRC and contractor supplied materials needed to complete the project. Bids should be for an all-inclusive effort to complete the installation of the fiber optic cable, duct, vaults, NEMA boxes, and ancillary components in its entirety. Adhere to all the design criteria laid out in design documents prepared by Williams Communications Inc. titled “Portage Fiber Build” and dated 03.19.2024 Boring under any paved surface is required. If for any reason a paved surface needs to be disturbed, the work must be agreed to in writing with ARRC prior to the work being performed. Any asphalt repairs must return the disturbed area to like new conditions Ends of Bore casings, buried conduit splices and Vaults to be identified by ARRC supplied Locate Markers Install Carsonite Route Markers at 500’ intervals along the fiber optic cable route and vault location warning signs at each vault location 100’ of slack shall be coiled in each vault Installation contractor should account for minor changes in fiber optic cable routing due to unforeseen obstructions Installer should never exceed the bend radius of the fiber optic cable being installed