Specifications include, but are not limited to: Special Testing/Inspections to include the following: Coordinate/Schedule inspections and testing with General Contractor (48 hours notice). | Ensure field personnel have relevant contract documents and submittals in advance. Check in and out with OPM. | Immediately notify the General Contractor and OPM of any deficiencies in writing. Notify the A/E if not corrected. | Distribute inspection reports and testing results within 5 business days. | Track completed inspections on drawings, include .pdfs with Interim Reports. | Maintain a deviation log. | Prepare and submit (16) Monthly Interim Reports. | Prepare the Final Report of Special Inspections. The above LS price to include $15,000.00 for unanticipated testing or inspections...