Specifications include, but are not limited to: Furnish and deliver a quantity of forty (40) Pump Interface Panels (PIP) to control two (2) pumps, as described in the description and quantity section. The Contractor shall furnish and deliver the proposed equipment within ninety (90) calendar days. Description: PIP panels are used to interface two (2) pump controls with existing station Remote Terminal Units (RTU). The PIP panels shall be built according to the PIP Minimum Equipment Specifications and the General PIP Electrical Schematic (Attachment A). For reference, see picture of basic PIP setup (Attachment B). Quantity: Forty (40) Pump Interface Panels (complete) to control two (2) pumps. Quality: Proposed equipment shall meet or exceed industry standards for quality and reliability. All materials, parts, and assemblies shall be new and free of corrosion, blemishes or other cosmetic defects. Design and construction shall be consistent with current best engineering practices.