Specifications include, but are not limited to: 1. 12 Each, Remove and patch top of selected CMU pilasters to repair the steel rigid frame top flange. Provide all materials as required for a complete installation in accordance with the plans and specifications. Per Each. $________ $____________ 2. 12 Each, Remove and patch bottom of selected CMU pilasters to repair the steel rigid from base, encase base in concrete. Provide all materials as required for a complete installation in accordance with the plans and specifications. Per Each. $________ $_ 3. Lump Sum Remove and replace existing metal downspouts and scuppers located within CMU pilasters. Provide all materials as required for a complete installation in accordance with the plans and specifications. $____________ 4. Lump Sum Patch TPO separation at existing roof gutters. Remove existing mesh screen at gutters. Remove and replace existing roofing system termination bars at gutters. Provide all materials as required for a complete installation in accordance with the plans and specifications. $____________ 5 Lump Sum Remove and replace existing below grade storm drain pipe. Upsize pipe from 6” to 8”. Install cleanout at existing downspouts above finished grade. Cut and patch existing concrete sidewalk for pipe replacement work. Provide all materials as required for a complete installation in accordance with the plans and specifications.