Specifications include, but are not limited to: The scope of this project involves scoping a wide, smooth, relatively flat trail, approximately two miles long. The project will tiein to the existing trail at Road 4 South and connect to the planned northern end of the Prescott portion of the Peavine Trail. A proposed route includes significant portions located off the existing rail bed where a new trail will need to be built. In addition, a major wash crosses the trail route and will require an engineered solution to create a sustainable trail. The scope of work includes: ● Conduct field survey. ● Prepare a scoping document. ● Coordinate with Town, City of Prescott, and CYMPO. ● Develop 30% design documents including plans and estimate. ● Conduct management and administrative tasks including coordination, meetings, schedule updates, comment responses, etc.