Specifications include, but are not limited to: The State Route 89/Willow Creek Road (Deep Well Ranch Road) Multi-Use Path (MUP) is a feasibility study that includes the preparation of 30% design drawings and accompanying estimated construction costs for an approximately 0.6-mile MUP along the western shoulder of State Route 89. The northern terminus of the proposed MUP meets the existing terminus of the western shoulder of State Route 89 near mile marker 321 approaching Deep Well Ranch Road. The proposed MUP would extend the existing shoulder southbound, bypassing the roundabout at the intersection of Deep Well Ranch Road and State Route 89 by running along the northwest side and continuing along Willow Creek Road, ultimately connecting the proposed MUP to the existing MUP at the intersection of Willow Creek Road and Amethyst Lane (proposed southern terminus). The scope of work includes: ● Conduct field survey. ● Prepare a scoping document ● Coordinate with the City of Prescott and CYMPO. ● Conduct management and administrative tasks including coordination, meetings, schedule updates, comment responses, etc.