Specifications include, but are not limited to: Temporary Cooling Units Systems Provide all-inclusive cost for two (2) complete fully functional temporary cooling units to allow for continued operation of Soleng Tom’s kitchen during construction. Temporary equipment will be on an as needed/if needed basis and will only be paid if temporary equipment is required and prior approved by the district. The all-inclusive cost shall include all necessary costs to render a complete and fully functional temporary system, including but not limited to first month rental charge (base min. cost), to include delivery, and set-up and start-up, electrical connections, cords, hoses, valves, and adapters, pumping systems, water treatment, security fencing, and breakdown and removal. In addition to the base minimum cost, provide the monthly cost for two additional months (three months total) which will be used on the pricing page in the determining of the lowest priced vendor.