Specifications include, but are not limited to: BASE BID WORKSCOPE - Demolition - Lobby: 1. Special attention shall be provided to protect existing carpet and slate flooring with Masonite like material. 2. Cover and protect all flooring and furniture as required. 3. Remove 2 sets of double doors in the lobby hallway. 4. Package, protect, and prepare doors for shipment and long-term storage. Note: Door frames and door trim located on the Lobby Side shall remain in place. President and Provost Office Interior Side:1. Special attention shall be provided to protect existing carpet and slate flooring with Masonite like material. 2. Erect floor to ceiling dust barrier wall system. 3. Cover and protect all flooring and furniture as required. 4. Remove all interior door trim and prep area for new work. New Work - President and Provost Office Side: 1. Fill in existing openings in accordance with the STC 55 design requirements. Refer to Design Specifications for more information. 2. Furnish and install chair rail, baseboard and ogee, and decorative wainscoting from nearest inside corner to corner and shall match existing. 3. Patch and paint all new to match existing. a. Sherwin Williams Origami White for Trim, Chair Rail and Molding. b. Sherwin Williams Antique White for Walls...