Specifications include, but are not limited to: A. Diagnostic Services and Repair/Replacement combined: Contractor shall: 1. Use all necessary tools to diagnose and analyze time needed to trouble shoot the issue. 2. Not remove any component of the structure, which cannot be returned to its original condition. 3. Complete and submit an Inspection report. After diagnostic services, if a repair is authorized and a second trip is required, the labor rate per person shall apply and may include a trip charge. B. Video Drain Lines: Contractor shall: 1. Video all drain lines through sewer vents, toilets, and sewer line cleanouts (if available) and provide a CD, or video, and report of any found conditions. 2. Ensure removal of toilets have new toilet hardware, replacement flange if required, new wax ring and the reinstallation of the toilet. If any deficiencies are found preventing proper installation of the toilet the contractor will contact the Rehab Coordinator (Coordinator) prior to installation. C. Electro-clean all drain lines through sewer vents, toilets, and sewer line clean-outs (if appliable). Removal of toilets will require new toilet hardware, replacement flange if needed, new wax ring and the reinstallation of the toilet. If any deficiencies are found preventing proper installation of the toilet the contractor will contact the Rehab Coordinator prior to installation. 1. Contractor will provide a report documenting any problems or concerns found. D. Perform gas pressure test: Contractor shall: 1. Include the installation of all new ¼ turn gas valves, drip legs, fittings, and gas lines for the entire home. 2. Remove/cap all gas flex lines, pressurize gas system, and monitor for leakage. 3. Advise Coordinator of any issues found. 4. Meet the city inspector to complete gas leak test. 5. Provide a report of any problems...