Specifications include, but are not limited to: Mobilization Includes travel, set-up, and labor cost. Private utility locates or electrical. Installation of construction entrance 15” x 12” using filter fabric and 6” of ABC Stone. All items must be removed after project completion. Grading Grade, Shape, & Compact Existing Stone Base. Unit Prices: Additional ABC Stone if needed - Installed, Graded, and Wet Set. Paving Provide and install Asphalt Surface 3" S-9.5B (two Lifts). Basketball Goal System Dig and set concrete foundations for two (2) BA871XL Bison Fixed Height Ultimate Series Basketball Goal Steelo 42 x 72 and install goals and post according to manufactures directions. Pickleball Net Post Foundation Dig and set concrete foundations for four (4) pickleball courts and four (4) center strap anchors. Net post foundations will be 18” x 18” wide and 36” in depth with sleeves. Center strap anchors will be 12” x 12” wide and 12” in depth. Court Debris Removal Clean and scrape courts of all loose material, dirt, foreign matter, and debris. Birdbaths/Depressions Patch any depressions holding more than 1/8" of water after being allowed to drain for one hour using an acrylic patch material.