Specifications include, but are not limited to: The park site is located within a FEMA SFHA and the FEMA Floodway as shown on Flood Insurance Rate Map (FIRM) number 41005C0545D dated June 17, 2008. The site is located on top of the western bank of the Molalla River, with proposed maintenance improvements being located at FEMA cross section (XS) BI with an NAVD88 Base Flood Elevation (BFE) of 376.8’. The project proposes a 2” overlay of existing asphalt pavement, curb replacement, as well as extensions of various existing parking stalls to provide safer travel routes for pedestrians and vehicles within the developed recreational area. Improvements are located at NAVD88 elevations ranging between 368 to 376+/-. The total improvements result in 642.6 CY of fill volume, therefore, a cut volume equal to the cumulative fill volume is proposed to balance the earthwork within the SFHA and not reduce flood carrying capacity. Refer to the attached exhibit (EX1) for a plan view of improvements and volumes. The improvements do not impact any existing structures nor will it alter watercourses.