Specifications include, but are not limited to: Inspections and Testing - All inspection and testing shall be performed in accordance with the requirements of the relevant and current National Fire Protection Association standards, any manufacturers’ recommendations, and the authority having jurisdiction for the individual location. The Contractor shall return the system to normal operation after any work has been completed. Any deficiencies shall be brought to the immediate attention of the DWR representative. The Contractor shall provide a detailed report documenting the inspection and test procedures and results. This report shall include any recommended modifications or repairs and an itemized proposal to correct these issues. This report shall be delivered to the DWR representative within 7 business days. Inspection and testing shall also include all the below when applicable: 1. Releasing panel functions, 2. All initiating, and notification appliances shall be tested, 3. Verify activation of the building fire alarm system, 4. Lights and LEDs on fire alarm panel 5. Fuse ratings 6. Initiating circuits 7. Discharge circuits 8. Container pressure 9. Electric bells, Horns, and Strobes 10. Detectors 11. Manual Stations 12. Abort switches