Specifications include, but are not limited to: 1. The work included under Division 26 and Division 40 is for the lift station portion of the project and shall consist of furnishing labor and materials necessary for the complete installation of the electrical systems shown on the Contract Drawings and described in the Specifications. This shall include minor items which are necessary to complete the installation and usually included in similar work even though not specifically mentioned in the Contract Documents. 2. Contractor is responsible for the coordination of the installation of electrical equipment with other trades. Where conflicts between disciplines arise, contact the Engineer prior to equipment installation.