• Awarded Vendor will be responsible for removal of existing curtains, furnish and installation of all new curtains, and removal of all debris, this includes the old material and any debris from the installation. • All new curtains must be IFR material. • New curtains may be different sizes/quantities, but they must, at a minimum, cover the entire area that the existing curtains cover. • Colors will be confirmed once bid is awarded, current listed color is as a guide. Colors will include Navy Blue and Cream at different locations please see pics and see when visiting location. • Traversing curtains shall be replaced with traversing curtains. Non-traversing curtains shall be replace with non-traversing curtains. • Existing hardware should be re-used for installation of new curtains everywhere possible. • Work is to be performed during normal business hours: Monday-Friday 8:00 am – 4:00 pm. • Before leaving each afternoon, vendor must have the area picked up enough to not cause a safety hazard.