The work will consist of replacing 5 hydrants and 2 water service lines. The hydrant work will consist of: - Contractor calling in MISDIG - City will turn hydrant valve off and provide the new hydrant. - Contractor will perform all excavation/sidewalk/asphalt removals and remove the existing hydrant. - Contractor will connect the new hydrant and provide/install/compact backfill. - Contractor will provide and perform all restoration work including sidewalk, curb, pavement, topsoil, and mulch blanket. The water service lines work will consist of: - Contractor calling in MISDIG - Contractor coordinating with the City regarding water turn-off. - Contractor performing sidewalk removal/asphalt driveway removal/and trench excavation. - Contractor will install new 1” type k copper water line (City will provide) from the City curb stop to the meter inside the house. (Plumber may be needed to hammer drill through the wall and hook up at the meter) - Contractor will provide/install/compact with clean backfill. - Contractor will provide and perform all restoration work including new concrete sidewalks and new asphalt driveways.