Specifications include, but are not limited to: • Existing 1000-gallon septic and pump tanks will need to be pumped out by an approved septage hauler and properly abandoned (crushed and filled). This is a requirement of the Construction Authorization Permit. Once this is completed, an abandonment verification will be issued to the property owner. • A new 1000-gallon septic tank and 1000-gallon pump tank to be installed. • NEMA 4x alarm/control box installed within eyesight of pump tank. • Two manual disconnects for power supply that serve both pump controls and alarm will need to be installed within eyesight of pump tank, side of building adjacent to pump tank. The panel for power is approximately 15 feet from the exterior wall to mount manual disconnects. The cost of any permits associated with an electrical inspection as well as the services that would be rendered by an electrician must be included in the bid. • Effluent pump that can deliver a minimum of 39gpm @ 20ft total dynamic head (TDH). • 550 feet of schedule 40 2-inch PVC (supply line to drainfield) • Pressure Manifold as depicted on Construction Authorization Permit #CA 23-228, including an appropriate turf box to allow for maintenance, as needed. • 440 feet of an approved ‘low profile chamber’ trench material.